ABB/SUSA Cairo South Power Station
Capacity: 720,000.00 gpd (0.72 MGD)
Location: Cairo – Egypt
Type: Demineralized Water System
Application: Boiler Demineralized Make Up Water System
Units Involved: This project involves the supply of three (3) independent trains for a demineralization system for the new power generation facility, 30 km south of Cairo.
Nile river water is the source for this project. Each train consists of a GAC filter, strong acid cation, weak base anion, degasifiers, strong base anion, and a mixed bed.
The equipment includes a regeneration system and chemical storage