United Engineers and Constructors – Colorado
Capacity: 210,000.00 GPD
Location: Nevada – USA
Type: Demineralized Water System
Application: Power Plant Demineralized Make Up Water System
Capacity: 210,000.00 GPD
Units Involved: Each system consists of a complete make-up water treatment system.
The raw well water is 1,580.00 μohms/cm @ 25° c., and is treated with twin softeners, filtration, reverse osmosis, dual working mixed-beds, and other sub-systems to complete the design.
Each plant has an Allen Bradley PLC, with man-machine interface (MMI), and a data highway to the plant DCS system.